Open-cut
Editor’s log: The road to rehab intensifies
The 1970s marked a revolution in underground infrastructure with the birth of cured-in-place-pipe (CIPP) technology, allowing pipe repairs without excavation. This innovation, alongside other trenchless methods, has transformed the industry and continues to drive efficient solutions for aging infrastructure.
Steering Through Sandy Soils to Upgrade City Sewer System
The economy in Garden City, Kan., is strong with the recent opening of a Dairy Farmers of America plant. Approximately 4 million pounds of milk from regional farmers makes its way to the plant each day, which has led to expansion for many other companies throughout the area. To keep up with the expected growth from the dairy industry and retail stores being constructed nearby, Garden City is upgrading existing utilities to ensure they are prepared to handle current and future needs.
Rubber Tire Trencher: Toro
The Toro RT600 riding trencher is built to deliver smooth, consistent performance in tough digging conditions. The RT600 is the only trencher in its class using a flywheel, torsion shaft and planetary gear reduction system. The flywheel minimizes trencher stalls, the torsion shaft absorbs shock load..
![](/media/1055/uc-enews-300x140-100.jpg?width=380)
- Deadline to submit abstracts for Underground Infrastructure Conference's 30th anniversary education program extended to July 19
- Drilling under the LSU campus
- OSHA investigation launched after worker found unconscious in Kansas City, Mo., sewer pipe
- 26th annual directional drilling survey: More fuel on the fire
- Restoring power to Minnesota’s northwest angle
- Vermeer Debuts New Horizontal Directional Drill
- Sewer maintenance: Myth-busting, best-practice training
- Berkeley pushes PG&E to bury power lines to mitigate wildfire risk
- Houston faces hurdles in transitioning to underground power lines amid severe weather concerns
- Calgary declares state of emergency over water pipeline repairs