Author Guidelines
These guidelines are for authors, or their representatives, wanting to publish a technical article or column in any monthly issue of “Underground Construction” (UC). If the author does not yet have an abstract, then the process begins with them sending an email to the UC editorial team, with their proposed Title including in what section of the magazine they wish this article to be featured. See UC annual Media Planner for dates of Special Focus, regular and bonus features.
- Articles should be focused on the needs and challenges of the operating company (normally a pipeline/utility) and the specific solutions that were designed to handle the situation. Therefore, it’s preferable for articles to be written in a case study/history format, generally beginning with the conclusion, then developed in a manner that illustrates how the solution was arrived at. If possible, we prefer to see the name of an operating company official involved in the authorship.
- Try to limit articles to a range within 1,000 to 1,500 words. Also keep in mind that we often look for one-page articles to publish, which can include about 750 words and an illustration. Send us a brief synopsis of the proposed article so that we have an idea of your topic. We’ll get back to you as quickly as possible with a plan. Articles based on technical papers are acceptable providing that they can be adapted to our standards and have not been published by a competing publication.
- We need to have materials in our hands about six weeks prior to actual publication. This means that for our July issue, we need materials NO LATER than May 15.
- Materials should be submitted in a Word document with any accompanying figures, pictures, etc., sent separately as jpg or tif files. We need high-resolution art, at least 300 dpi. If you have a picture that you would like considered for our cover, it’s recommended that a professional photographer take the picture in order to ensure the highest quality possible. Image size for covers should be at least 2400 px by 2600 px. Please include website and company phone number of key sources including contractors, owners, engineers and vendors when possible.
- All articles must in some way relate to the underground construction/rehabilitation business: sewer, water, storm water, gas distribution, telecommunications (fiber), electric distribution and transmission, gas distribution and natural gas, crude oil or product pipelines. For more information or to offer suggestions, look at our Editorial Calendar or call or email the editorial staff.
- Articles should be moderately technical in nature. They should be able to appeal to a manager or engineer level. For instance, we prefer that equations be left out or kept to a minimum. Charts/figures should be limited to 3 or 4. Always try to include economic considerations when applicable and practical.
- Articles MUST remain commercial-free. Any submission that appears as a blatant advertisement for a particular product or service will be rejected. References to a specific product or service are permissible if mentioned only once or twice. The magazine does contain a popular New Products department in which an article is permitted to provide a larger look at a new product or service that seems likely to have an impact on our industry.
- Once submitted to the magazine, all materials become the property of Underground Construction. If an article needs to be strongly edited, we prefer that it be sent back to the author for additional work. This happens occasionally and should not be taken as a rejection. We typically do NOT send articles back for review prior to publication unless a) substantial changes were made; b) requested by the author. Remember that our editors are trained to make your story better, not to rewrite it.
- Try to include a brief biography of the author(s) and a good quality color headshot.
- After the article is published, we will be delighted to send you several complimentary copies at your request. Keep in mind that we are also in the business of publishing reprints, which, for a nominal fee, provide you with an outstanding sales tool. We will post articles on our web site, however, these are not meant for reproduction purposes.
We look forward to working with you.
Sign up to Receive Our Newsletter
- OSHA cites Florida contractors for trench safety violations at sewer and excavation sites
- Cadiz to reuse steel from terminated Keystone XL pipeline for California groundwater project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Biden-Harris administration invests $849 million in aging water infrastructure, drought resilience
- Frontier-Kemper wins $1.1 billion New York tunnel project