September 2024 Vol. 79 No. 9
Editor's Log
Features
Wyo-Ben’s Max Gel and Max Bore HDD system offer premium solutions for enhanced drilling performance and efficiency. These innovative products ensure superior wellbore stability, suspension, and filtration control, making them essential tools for a variety of drilling applications.
The Waukesha, Wisconsin, pipeline project faced a significant challenge when an unlocated sewer forced the team to redesign the HDD path, leading to a novel approach using both HDPE and RJ-DIP pipe types in the installation. The collaboration between contractors and engineers resulted in a cost-effective and environmentally friendly solution.
Waukesha, once famous for its spring water and hailed as a "cure-all," now turns to Lake Michigan for a sustainable water source. A new 36-mile pipeline project aims to supply 8 million gallons of water per day to 16 Wisconsin communities.
- Fatal Shawnee trench collapse linked to Oklahoma contractor’s repeated safety violations, OSHA reports
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Explosion in underground PG&E vault leaves one dead in Richmond, Calif.
- Tennessee pipeline gets initial FERC approval despite environmental concerns
- Sinkhole in Texas town accrues over $800,000 in sewer rehabilitation costs
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- GasTracker Accurately Locates Plastic Gas Pipes
- Florence, S.C., to fund $537 million sewer, water upgrade with bonds and 5% rate hike
- Union County, Ga., breaks ground on $20.5 million fiber broadband expansion project