James River Water Authority breaks ground on pipeline project for Louisa, Fluvanna counties
(UI) — The James River Water Authority (JRWA) broke ground in Fluvanna County on Aug. 14, kicking off a significant water infrastructure project expected to be completed in two years. The project aims to provide a sustainable water supply for the growing populations of Fluvanna and Louisa counties in Louisa, Virginia.
The project will consist of a fully submerged water intake in the James River, a water pump station, and a raw water pipeline to carry the water nearly four miles, where it will connect to an existing Louisa County Water Authority water main. By utilizing water from the James River, Fluvanna and Louisa will not only minimize their reliance on surface and groundwater, but also will adequately meet the water needs of their growing populations. This project began in earnest over two decades ago, when similar to the effects of the drought experienced this summer, the surface and groundwater systems were stressed in both counties.
It is estimated that millions of gallons of water will be needed daily in the area in the coming years, making this forward movement of the initiative highly important.
“The James River can safely and sustainably accommodate a withdrawal to meet that anticipated demand,” said Fluvanna County Board of Supervisors Chairman Chris Fairchild. “Even during the lowest flows, the James will provide water for our communities.”
JRWA is a partnership between Fluvanna and Louisa County, where both counties share in the investment and will receive 50% of the supply when the system is operational. Louisa County Board of Supervisors Chairman Duane Adams noted the collaboration between counties was a model for other jurisdictions and stressed the fiscal responsibility of the long-term plan.
Detailed studies and formal permitting spanning a number of years have resulted in an abundance of confidence that the selected location and water main route represent minimized impacts on the environment and historical resources.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments