Oregon City Completes In-Pipe Hydropower Project
(UC) — The City of Hillsboro, Oregon has completed a project that generates electricity by harvesting excess pressure from a city water pipeline.
The project was completed using technology from InPipe Energy that bypassing existing pressure control valves and converts excess pressure from the pipe into electricity.
Th project is expected to generate 185,000 to 200,000 kWh or more of electricity per year that will help power the lighting, electric vehicle (EV) charging stations and concessions at Hillsboro’s Gordon Faber Recreation Complex.
InPipe claims the technology will reduce more than 162,000 pounds of carbon annually.
“As a growing city, we’re excited to pioneer this very practical new form of renewable energy that will help us continue to meet our climate action goals and build resilience,” said Hillsboro Mayor Steve Callaway.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Colorado's Wolf Creek Pass tunnel drainage project begins
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments