Sewer Break That Caused Sinkhole May Cost Michigan $100 Million
FRASER, Mich. (AP) — The cost to fix a broken sewer line that caused a football field-sized sinkhole north of Detroit is estimated at more than $78 million, Macomb County’s new public works chief says.
The project’s cost could rise above $100 million if more work is done to improve the rest of the sewer line, public works chief Candice Miller told Macomb County commissioners on Friday. The repairs could take about a year to complete.
“This is an enormous thing that’s happening to the county,” Miller said. “We’re up to the challenge. We’re going to get through this thing. We’re going to solve this problem. And somehow we’ve got to figure out how to pay for it.”
The sewer collapse was discovered after homeowners heard noises Christmas Eve and noticed their house was sinking.
Officials temporarily evacuated nearly two dozen homes because water and gas service had to be shut off. Nineteen families have since been allowed to return. Three homes were condemned.
About 400,000 people in surrounding communities have been asked to take shorter showers and wash only full loads of clothing as part of a voluntary water conservation plea until a fix is completed.
Officials have not yet determined an exact cause for the sewer collapse, but said earlier this month that a 2-inch diameter hole bored through the pipe after a 1978 collapse may have allowed groundwater to move up into the line and erode the soil beneath the pipe.
Gov. Rick Snyder declared a state of emergency that could also lead to seeking money from the federal government.
Miller said the county may use bonds to help pay for the repairs.
“We’re starting to talk about what we have to do from a financial standpoint here,” Miller said.
“We’re probably going to do a short-term bond. Maybe a long-term bond because we need some immediate cash for many of the expenses here.”
Water and sewage rates may also increase.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments