New York’s College Point completes $139 million upgrade: Water mains and sewers revamped
(UI) — A $139 million infrastructure project in College Point, Queens, has been completed, upgrading over 14 miles of water mains and sewers, along with street improvements.
The project, managed by the NYC Department of Design and Construction (DDC) in partnership with the NYC Department of Environmental Protection (DEP) and Department of Transportation (DOT), spanned more than 100 city blocks and included the installation of new stormwater systems, water mains, and sanitary sewers.
"This major infrastructure brings critical investments to College Point, with upgraded roads and sidewalks that improve accessibility and enhance safety for all," said DOT Commissioner Ydanis Rodriguez. "We thank the teams for their commitment and the support of Councilmember Paladino and Queens Borough President Richards."
The improvements included nearly 8.5 miles of new sewers and seven miles of water mains, replacing old, outdated systems. The new infrastructure includes storm sewer chambers, tide gates to prevent flooding, and micro-tunneling to minimize disruptions. The project also upgraded 24.5 acres of road with new asphalt and ADA-compliant pedestrian ramps.
"These upgrades will help manage stormwater and mitigate the effects of climate change for local residents," said DDC Commissioner Thomas Foley.
The project also added fire hydrants, new trees, and restored over 8,000 square feet of wetlands.
"This is a massive win for College Point, finally delivering the modern sewer system it needed," said Queens Borough President Donovan Richards Jr.
Local officials praised the completion of the project, citing the improved water management, reduced flooding, and better quality of life for residents.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments