Davis, W.Va. secures $5 million grant to revamp decades-old sewer infrastructure
(UI) — Davis, a town nestled in Tucker County, West Virginia, is set to modernize its aging wastewater system thanks to a $5 million grant announced by Senator Joe Manchin (D-WV), according to WBOY 12 News.
The funding, provided by the Environmental Protection Agency (EPA), aims to address capacity issues and prevent future fines for the town.
Mayor Alan Tomson highlighted the urgency of the upgrade to WBOY 12 News, noting that the current system, which treats both wastewater and stormwater, has been at full capacity for over a decade. With parts of the infrastructure dating back 60 to 80 years, the allocated funds will be dedicated to constructing a dedicated wastewater treatment system.
The overhaul not only ensures compliance with regulations but also paves the way for potential economic growth in Davis. By expanding the system's capacity, new residential and commercial developments can be accommodated, fostering a more sustainable future for the town.
Mayor Tomson expressed gratitude for the grant, which was pursued through collaborative efforts involving local and federal representatives, according to WBOY 12 News. Construction is expected to commence in the upcoming fall or spring, with completion anticipated within a year.
Related News
From Archive
- Alaska LNG pipeline could require 7,000 workers at peak construction, developers say
- Ohio trench collapse kills one worker, injures two during pipe installation
- California invests $590 million to boost water reliability, upgrade sewer systems statewide
- NYC launches 3D Underground mapping platform to modernize utility coordination
- Dominion proposes 186-mile underground HVDC power line across Virginia
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized
- Massive water line failure leaves majority of Waterbury without service
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year

Comments