Pennsylvania allocates $7.5 million for stormwater, sewer upgrades in Northampton
(UI) – Leigh Valley News reported that Bethlehem Township and Bangor Borough, in Pennsylvania’s Northampton County, are receiving $7.5 million, collectively, to make significant upgrades to their respective stormwater and sewer systems. The money is part of a greater $274 million granted to the state by the Environmental Protection Agency.

Bethlehem Township is set to receive over $5.5 million for stormwater improvements along Easton Avenue, aimed at addressing flooding risks and improving water quality in Nancy Run and the Lehigh River. Projects include retrofitting three storm water detention basins and creating a fourth.
Meanwhile, Bangor Borough will benefit from over $2 million to upgrade its sewer plant, addressing grading inconsistencies and outdated equipment like headworks pumps, drive-controlled pumps, a control-and-monitoring system at the digester building and more. These measures are intended to mitigate issues during wet weather and flooding, benefiting not only Bangor but also nearby areas like Martin’s Creek, Roseto, and Washington Township.
The funding is part of a broader initiative emphasizing clean water access as a constitutional right, facilitated by PENNVEST and supported by state and federal sources including voter-approved funds, federal grants, and stimulus funding from the Infrastructure Investment and Jobs Act.
This story was originally reported by LeighValleyNews.com
Related News
From Archive

- Trench collapse kills one construction worker in Houston, Texas
- Intrepid Fiber breaks ground on fiber optic network in Superior, Colo.
- Excavator collides with I-95 overpass in Henrico, Va., causing multi-vehicle crash
- Shrewsbury, Mass., expands sewer inspections and cleaning efforts
- Construction worker killed in trench collapse near Prosperity, S.C.
- Final construction phase kicks off for Indianapolis deep rock tunnel
- Texas contractor penalized by OSHA for repeated trench safety violations
- Trench collapse kills one construction worker in Houston, Texas
- WES tunnel boring machine retrieved from Oregon river after seven-month project
- Illinois overhauls Peoples Gas pipeline program, mandates focus on high-risk pipes
Comments