Aegion Corporation Wins $8 Million Texas Wastewater Rehab Contract
8/19/2020
(UC) — Aegion has announced its subsidiary, Insituform, has been awarded a wastewater rehabilitation contract in Southwest Texas valued at $8 million.
Insituform will rehabilitate more than 12,000 linear feet of existing sanitary sewer main utilizing trenchless technology, including 24-inch to 60-inch cured-in-place pipe (CIPP).
Crews will also perform bypass pumping, miscellaneous point repairs and associated manhole improvements.
“This is one of the larger projects Aegion has won in the region in recent years, and we look forward to completing the work safely using our industry-leading trenchless technologies,” Charles R. Gordon, Aegion’s President and CEO, said.
The project is expected to begin this fall and conclude by the end of 2021.
Related News
From Archive
Sign up to Receive Our Newsletter
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Colorado's Wolf Creek Pass tunnel drainage project begins
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments