GREENWOOD, Miss. (AP) — A Mississippi delta city is being asked to declare a state of emergency after a sewer line has separated.
Mississippi Delta City's 2-Year-Old Sewer Line Fails
4/26/2018
The Greenwood Commonwealth reports that a 24-inch (61-centimeter) underground sewer line has separated in Greenwood, causing a section of road between the city’s wastewater treatment plant and Leflore County Humane Society to cave in.
The line was installed during the wastewater treatment plant’s $40 million construction just two years ago.
Repairs are expected to begin Friday. Until then, affected roads have been blocked off and alternative routes established.
The city’s Wastewater Division Director Eddie Curry says the city has installed a pump to bypass the water from the line so residents are not affected. Without the bypass, over 35 percent of Greenwood residents would be impacted.
Related News
From Archive
Sign up to Receive Our Newsletter
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Colorado's Wolf Creek Pass tunnel drainage project begins
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments