Construction Error Dumps up to 1,000 Gallons of Raw Sewage
6/5/2017
MONTPELIER, Vt. (AP) — Construction in Vermont’s capital city hit a snag over the weekend after utility workers drilled into a sewer line Friday, dumping hundreds of gallons of raw sewage into the Winooski River.
A Montpelier Public Works spokesman says the leak wasn’t discovered until Saturday when the sewer started backing up.
The Times-Argus reports (http://bit.ly/2qVAAFS ) the leak was reported to the state on Monday. The state estimates between 100 to 1,000 gallons of raw sewage leaked into the river.
Contractors installed a temporary patch on Saturday, and the sewer line will eventually be replaced as a part of the reconstruction project. Repairs in the project are expected to continue into the fall.
Related News
From Archive
Sign up to Receive Our Newsletter
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Colorado's Wolf Creek Pass tunnel drainage project begins
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments