FERC: Company Can't Resume HDD Activities for Gas Pipeline
COLUMBUS, Ohio (AP) — A federal agency has told a company building a high-pressure natural gas pipeline it cannot resume drilling beneath creeks in southeast Ohio and northern West Virginia.
The Columbus Dispatch reports (http://bit.ly/2qu1x2r ) the Federal Energy Regulatory Commission on Thursday rejected Texas-based Energy Transfers’ request to resume horizontal drilling. The $4.2 billion pipeline project is being built to carry gas from Appalachian shale fields across Ohio and to other states.
A spokeswoman told the newspaper the company hopes to resolve all outstanding issues soon.
The Ohio Environmental Protection Agency has ordered the company to pay $714,000 in civil penalties connected to problems with pipeline construction that began this year.
The state agency says at least eight violations are under review, including mud spills from drilling, storm water pollution and open burning.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments