Indiana City Asks EPA for More Time to Cut Sewer Overflows
JEFFERSONVILLE, Ind. (AP) — A southern Indiana city wants the U.S. Environmental Protection Agency to give it 10 more years to reduce its raw sewage overflows.
A 2009 agreement gives Jeffersonville until 2025 to comply with the EPA’s sewage overflow reduction mandate. But the News and Tribune reports (http://bit.ly/2eBGMBZ ) the Ohio River city says its financial situation has changed and it can’t afford the $44 million left in the mandate.
Jeffersonville officials are seeking a 10-year extension to comply. City sewer department director Len Ashack says that’s the city’s “only option” remaining.
Jeffersonville is one of many U.S. cities facing EPA mandates to reduce their overflows of untreated sewage into streams and rivers. Those occur when runoff from rainfall or snowstorms overwhelm old combined sewer systems that accept both storm water and sanitary waste.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Colorado's Wolf Creek Pass tunnel drainage project begins
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments