Pipeline Construction Equipment Damage is Suspected Arson
DES MOINES, Iowa (AP) — Machinery located at three oil pipeline construction sites in central Iowa was found extensively damaged by fire Monday in what the company building the pipeline called a shameful act.
There’s little doubt the fires were intentionally set along the Dakota Access pipeline, said Jasper County Sheriff John Halferty. Damage to a bulldozer and other large tracked equipment was estimated at $1 million, he said.
The sheriff’s office was alerted around 6 a.m. Monday to a fire in a farm field 4 ½ miles west of Newton. Later, deputies learned of a second pipeline equipment blaze about 2 ½ miles southeast of Reasnor and a third site where four machines were damaged north of Oskaloosa, the Newton Daily News (http://bit.ly/2apGmwK ) reported.
In a statement, Texas-based Dakota Access said “it’s a shameful act by a group of people trying to disrupt our energy security and independence.”
“We have increased security along the route and are actively pursuing the situation with law enforcement. If caught, we will prosecute to the maximum extent allowed by law, both criminally and civilly,” spokeswoman Lisa Dillinger said in a statement. “We will not tolerate this kind of activity.”
Environmental, American Indian and landowner rights groups have vigorously fought approval of the pipeline and have vowed to continue protests and acts of civil disobedience.
“I’ve made lots of statements on this pipeline over the last two years and I’ve encouraged people to get ready for any nonviolent action possible but torching construction equipment was not on the list,” said Ed Fallon, director of Bold Iowa, a group that promotes renewable energy and fights fossil-fuel expansion projects.
Dakota Access, a subsidiary of Dallas-based Energy Transfer Partners, plans construction of a $3.8 billion, 1,168-mile project that cuts through Illinois, North Dakota and South Dakota. It also crosses 18 Iowa counties diagonally from northwest to southeast.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments