Columbia Gas to replace high-pressure lines, add utility stations in Upper Arlington, Ohio
11/11/2024
(UI) — Columbia Gas is set to begin a major infrastructure overhaul across Upper Arlington in 2025, with projects aimed at replacing aging high-pressure gas lines and adding two above-ground utility stations.
The new 20-inch diameter steel pipelines, which meet federal safety standards, will serve a wide region extending beyond Upper Arlington.
The first phase of construction is scheduled to start in spring or summer near Upper Arlington High School, with plans to minimize traffic and parking disruptions.
The upgrades will include:
- Replacement of old gas lines with new 20-inch steel pipelines featuring enhanced safety measures.
- Construction of two utility stations: one on Ridgeview Road and the replacement of an existing station on Brandon Road.
Columbia Gas has committed to keeping residents informed with mailed updates, public meetings, and ongoing project notifications.
Related News
From Archive
Sign up to Receive Our Newsletter
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Colorado's Wolf Creek Pass tunnel drainage project begins
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments