Aegion Awarded $12.4 Million Contract from Metropolitan Water Reclamation District of Greater Chicago
7/18/2016
Aegion Corporation has been awarded a $12.4 million contract by the Metropolitan Water Reclamation District of Greater Chicago to its Infrastructure Solutions platform for the rehabilitation of wastewater pipelines in the Village of Tinley Park, the Village of Oak Forest, Cook County Forest Reserve and unincorporated Cook County.
Insituform® cured-in-place pipe (CIPP) will be installed to rehabilitate approximately 14,000 feet of 60-inch wastewater pipelines. Installation is expected to begin in late 2016 with completion slated by the end of the first quarter of 2018.
Related News
From Archive
Sign up to Receive Our Newsletter
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments