Centuri wins nearly $400 million in U.S. utility infrastructure contracts
(UI) — Centuri Holdings, Inc. has secured nearly $400 million in new commercial awards across the U.S., the company said this week. The projects highlight Centuri’s role in supporting utility and energy infrastructure, with about 70% tied to new project awards and a new master service agreement (MSA). The remainder comes from an MSA renewal.
The awards include a major steel pipe replacement project with an existing Midwest customer, driven by federal compliance with the PHMSA Gas Mega Rule. In New England, Centuri signed a multi-year contract with a long-term customer to handle natural gas distribution replacement, system upgrades, and expansion across several territories.
Other projects involve work to ensure reliable power delivery to future data centers, including turbine deconstruction and refurbishment, as well as the full delivery of a clean energy project to install a Mechanical Vapor Recompression (MVR) system at an ethanol plant.
These new contracts follow $300 million in previously announced awards on August 27.
“These commercial awards with both new and existing customers reflect not only the strength of the relationships we build but also our customers’ confidence in our ability to deliver and innovate,” said Centuri President and CEO Christian Brown. “These deliberate pursuits showcase the breadth and range of both our capabilities and project management expertise, and position us for sustained growth and long-term shareholder value creation.”
Related News
From Archive
- Dominion proposes 186-mile underground HVDC power line across Virginia
- Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Trump vetoes bill to finish $1.3 billion Colorado water pipeline
- Massive water line failure leaves majority of Waterbury without service
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- Massive water line failure leaves majority of Waterbury without service
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year
- Worm-like robot burrows underground to cut power line installation costs

Comments