W.A. Rasic to lead $100 million water main overhaul in Los Angeles, Calif.
(UI) — W.A. Rasic Construction has secured more than $100 million in contracts from the Los Angeles Department of Water and Power (LADWP) to upgrade aging water infrastructure in the city, including the replacement of key segments of a century-old trunk line.
The largest of the awarded projects is the Western Trunk Line – Phase 2A. The $67.7 million contract involves the installation of approximately 12,000 feet of new 36-inch trunk line and 7,000 feet of distribution mains ranging from 6 to 12 inches in diameter. The work targets a deteriorating portion of the Harbor Trunk Line, which supplies clean water to South Los Angeles and surrounding communities.
“This is not just a routine upgrade,” the company stated. “It’s about ensuring safe, reliable access to water and reducing the frequency of emergency repairs.”
To increase resiliency, the new trunk line will use Earthquake Resistant Ductile Iron Pipe (ERDIP), designed to withstand seismic activity—an important factor as California continues to face droughts and increased earthquake risks.
The second contract awarded to W.A. Rasic supports additional improvements to LADWP’s broader infrastructure plan. Together, both projects are intended to reinforce system reliability and serve hundreds of thousands of residents.
With more than four decades of experience in underground utility and civil construction, W.A. Rasic has consistently partnered with LADWP and other agencies to deliver high-priority infrastructure solutions across the state.
Related News
From Archive
- Dominion proposes 186-mile underground HVDC power line across Virginia
- Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Trump vetoes bill to finish $1.3 billion Colorado water pipeline
- Massive water line failure leaves majority of Waterbury without service
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- Massive water line failure leaves majority of Waterbury without service
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year
- Worm-like robot burrows underground to cut power line installation costs

Comments