Port Arthur to evaluate water service lines and meters
Port Arthur, Texas (UI) — The City of Port Arthur is set to conduct evaluations of water service lines and meter verifications as part of the Environmental Protection Agency's (EPA’s) efforts to improve the Lead and Copper Rule.
In response to regulatory requirements, the Water Utilities Department has implemented corrosion control treatments aimed at reducing lead leaching from plumbing systems. Regular Lead and Copper sampling, conducted every three years as mandated by the Texas Commission on Environmental Quality (TCEQ), has consistently shown lead levels below detectable limits.
The next phase involves conducting a comprehensive inventory of lead service lines by assessing connections from customers’ meters. Concurrently, water meters will undergo verification as part of this process.
The evaluation work will include digging pit holes to expose sections of water service lines near the meters, facilitating thorough inspections and assessments.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments