Miller Lane water main installation project underway in Cheyenne, Wyo.
7/15/2024
(UI) – Construction for a water main installation on Miller Lane, between Townsend Place and Crow Road, begins this week, according to the Board of Public Utilities (BOPU).
The project is expected to last approximately four weeks, depending on weather and material availability.
This project is part of the BOPU’s initiative to enhance water service reliability by renewing aging infrastructure. The work will be carried out by Aztec Construction Company. The BOPU appreciates residents' patience as these essential upgrades are completed.
The BOPU aims to minimize disruptions, keeping businesses accessible during the project. While planned water shut-offs will be coordinated, unplanned emergency shut-offs may also occur.
Related News
From Archive
Sign up to Receive Our Newsletter
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Colorado's Wolf Creek Pass tunnel drainage project begins
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- New Portable Welding System From Miller
- Excavator Causes Puerto Rico Power Outage
Comments