Miller Lane water main installation project underway in Cheyenne, Wyo.
7/15/2024
(UI) – Construction for a water main installation on Miller Lane, between Townsend Place and Crow Road, begins this week, according to the Board of Public Utilities (BOPU).
The project is expected to last approximately four weeks, depending on weather and material availability.
This project is part of the BOPU’s initiative to enhance water service reliability by renewing aging infrastructure. The work will be carried out by Aztec Construction Company. The BOPU appreciates residents' patience as these essential upgrades are completed.
The BOPU aims to minimize disruptions, keeping businesses accessible during the project. While planned water shut-offs will be coordinated, unplanned emergency shut-offs may also occur.
Related News
From Archive
Sign up to Receive Our Newsletter
- Fatal Shawnee trench collapse linked to Oklahoma contractor’s repeated safety violations, OSHA reports
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Explosion in underground PG&E vault leaves one dead in Richmond, Calif.
- Tennessee pipeline gets initial FERC approval despite environmental concerns
- Sinkhole in Texas town accrues over $800,000 in sewer rehabilitation costs
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- GasTracker Accurately Locates Plastic Gas Pipes
- Florence, S.C., to fund $537 million sewer, water upgrade with bonds and 5% rate hike
- Union County, Ga., breaks ground on $20.5 million fiber broadband expansion project
Comments