Stantec to modernize Los Angeles underground electrical infrastructure in $104 million LADWP contract
(UI) — Stantec has been selected by the Los Angeles Department of Water & Power (LADWP) for a new five-year, $104 million master services agreement (MSA) aimed at upgrading and modernizing electrical infrastructure across greater Los Angeles.
The agreement is part of LADWP's Power System Reliability Program (PSRP) to renew aging infrastructure and advance the clean energy transition.
Under the agreement, Stantec will serve as one of the Owner’s Representatives, providing a range of services, including transmission planning studies, reliability assessments, and economic evaluations. The firm will also offer consulting services for construction, maintenance, safety, quality assurance, testing, and commissioning as needed.
In addition to infrastructure upgrades, Stantec will conduct planning and feasibility studies, renewable resource assessments, and reliability evaluations. The scope of work also includes engineering services for conventional and renewable energy projects, covering civil, electrical, mechanical, structural, and geotechnical engineering.
"Modernizing and expanding electrical infrastructure is crucial for delivering power safely and reliably, especially as we integrate more renewable energy into the grid," said Mario Finis, executive vice president of Energy & Resources at Stantec.
Stantec's Energy & Resources team specializes in power delivery services, including generation, transmission, and grid modernization projects. The firm is also involved in significant projects like the SunZia Transmission Project, which is part of the largest clean energy infrastructure initiative in U.S. history.
Related News
From Archive
- Alaska LNG pipeline could require 7,000 workers at peak construction, developers say
- Ohio trench collapse kills one worker, injures two during pipe installation
- California invests $590 million to boost water reliability, upgrade sewer systems statewide
- NYC launches 3D Underground mapping platform to modernize utility coordination
- Dominion proposes 186-mile underground HVDC power line across Virginia
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- Massive water line failure leaves majority of Waterbury without service
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year
- Worm-like robot burrows underground to cut power line installation costs

Comments