Lynchburg, Va., to begin sewer pipe root control maintenance, aiming to prevent overflows
8/30/2024
(UI) — Lynchburg Water Resources (LWR) and contractor Duke’s will begin chemically treating approximately 9,000 feet of sanitary sewer pipes across the city on Sept. 3 to manage root intrusion.
The two-week project aims to maintain the sewer system and prevent costly backups and overflows.
Work will occur near properties at various locations, including 12th Street, Bonair Circle, Kenmore Drive, Oakwood Place, and Riverside Drive. Crews will access the sewer system through manholes and will not disturb personal property.
Temporary traffic controls will be set up periodically, and minor delays are expected. Motorists are advised to use caution in work zones. Emergency vehicles will maintain access throughout the project.
Related News
From Archive
Sign up to Receive Our Newsletter
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Colorado's Wolf Creek Pass tunnel drainage project begins
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- New Portable Welding System From Miller
- Excavator Causes Puerto Rico Power Outage
Comments