California American Water completes $4.1 million Ventura County water system upgrades
(UI) – California American Water recently invested in improving its pumps, piping and electrical equipment in the White Stallion Community in unincorporated Ventura County and within Wildwood Park in the City of Thousand Oaks.
The White Stallion Booster Pump Station project, a $2.3 million investment, included the replacement of the existing pump station with a MuniQuip pump skid, a new canopy to protect the pumps from weather elements, a new emergency generator to provide backup power for fire protection, improved communication and alarm system to better assist in resolving errors, upgraded electrical service to meet current fire flow protection requirements, and installed a chlorine analyzer to better manage water quality.
The Wildwood Booster Pump project, a $1.8 million investment, added an above-grade building to protect the new equipment, installed an emergency generator to provide backup power for fire protection, improved the communication and alarm system to better assist in resolving errors, improved site security with a new fence, and replaced cracked pavement with a new driveway and sidewalk.
Both booster upgrade projects reflect an important investment in public health and safety, as well as the economic health of the communities California American Water serves.
“The White Stallion and Wildwood projects are part of California American Water’s multimillion-dollar initiative to renew water infrastructure that has reached the end of its useful life,” said Jessica Taylor, Director of Operations, Southern Division, California American Water. “The completion of these projects improves the reliability of our pump stations and protects our system against weather elements – both of which are especially crucial for providing fire protection.”
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments