Sypris wins contract for largest water pipeline project in Oklahoma history

(UI) – Sypris Technologies, Inc., a subsidiary of Sypris Solutions, Inc., recently received an order to supply 72-inch Insulated Joints for use in the expansion of the Atoka Water Pipeline for the Oklahoma City Water Utilities Trust. Shipments under this award are expected to start in 2023 and finish in 2024.

water pipeline

According to news sources, the second Atoka Pipeline is being built to provide Oklahoma City and its surrounding areas with potable water. The project is the largest municipal water infrastructure project in the history of the state and includes a new 100-mile-long, 72-inch diameter pipeline that will transport raw water from Lake Atoka to Lake Stanley Draper in Oklahoma City, where it will be treated and delivered to more than 1.4 million people in central Oklahoma. The pipeline is slated to cost $800 million and move more than 100 million gallons of water per day.

Sypris has agreed to manufacture and supply its Tube Turns-branded monolithic Insulated Joints for cathodic protection of the new 72-inch polyethylene-coated and cement-mortar lined steel pipeline. These Insulated Joints will be 72 inches in diameter and will be rated to a pressure of 300 psi.

Brett Keener, General Manager, commented, "By leveraging our extensive engineering design and manufacturing expertise, we believe we are uniquely qualified to support these types of demanding projects. We are proud to be a part of a project with a goal of providing reliable water infrastructure which is essential to public health and our way of life."

Related News

From Archive

Comments

{{ error }}
{{ comment.comment.Name }} • {{ comment.timeAgo }}
{{ comment.comment.Text }}