Mastenbroek releases Magic Eye to minimize gravel waste
Mastenbroek has launched an innovative new product to help contractors save money and improve the accuracy of backfill levels when installing drainage schemes or utilities.
Developed and refined over a six-month period, Mastenbroek’s Magic Eye package combines a radar sensor with a software application to control the amount of gravel or sand that is dispensed by the hopper when backfilling.
It is available now as an optional extra on Mastenbroek’s trenchers and retrofittable to any machine with a suitable hydraulic variable height gravel hopper. The Magic Eye regulates itself to the ground level ensuring the optimum amount of gravel is dispensed.
Mastenbroek developed the Magic Eye in response to customer requests for an automated way of minimizing wastage.
The costly issue was first raised with Mastenbroek by Darren Cotton of Les Cotton Contractors. Operating in Suffolk and undertaking agricultural and sports field drainage across East Anglia, Les Cotton and his team also helped test the Magic Eye as part of the development process.
“We have a history of problem-solving and developing innovative solutions to help our customers work more efficiently and effectively," says Christopher Pett, Mastenbroek’s Commercial Director. "Developing the Magic Eye was an interesting project to oversee. It was very rewarding to see how our whole team – electrical, mechanical and software engineers – came together to work out an effective solution to Les and Darren’s request.”
Les Cotton Contractors recently bought a Mastenbroek CT12 crawler truck. As well as fitting the Magic Eye control to the trencher hopper, Les and Darren are working with Mastenbroek to adapt the technology to work with a front-mounted gravel hopper on the CT12, which is interchangeable with the front swing conveyor.
For more information about Mastenbroek and the Magic Eye visit www.mastenbroek.com, email info@mastenbroek.com or call +44 (0)1205 311313.
Related News
From Archive
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Cadiz to reuse steel from terminated Keystone XL pipeline for California groundwater project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
- Excavator Causes Puerto Rico Power Outage
Comments