Boil Advisory Lifted for All of Jackson, One Month Later
(AP) — After 30 days of boiling their water to get rid of contaminants and sometimes no water at all, Jackson residents are finally able to drink the water from the tap after officials lifted a boil water advisory put in place in mid-February when a deep freeze wreaked havoc on their water infrastructure.
The city’s 43,000 surface water connections were released Wednesday from the boil advisory put in place on Feb. 16. A boil notice had previously been lifted for the city’s 16,000 well water connections on March 10.
After officials said cold weather froze equipment at the city’s water treatment plant, thousands of water customers went weeks with low pressure or no pressure at all, collecting water in buckets from distribution sites throughout the city to flush toilets and clean themselves. National Guard members were called in to help distribute water. Volunteers loaded tanks of water on trucks to deliver to apartment complexes housing seniors and those without transportation.
Mayor Chokwe Antar Lumumba said the crisis has been caused in part by decades of neglect of aging infrastructure. Parts of Jackson’s water system are a century old, he said.
A major factor affecting the city’s ability to update its system has been a rapidly declining tax base because of “white flight.” Jackson’s tax base began crumbling decades ago, starting after the integration of public schools.
Voters in 2014 overwhelmingly approved an extra 1% sales tax for infrastructure repairs, but the $15 million a year raised is only a fraction of what Jackson needs. Lumumba said close to $2 billion is required to modernize the water system and other infrastructure related to sewer and roads.
The Democratic mayor wrote a letter to Republican Gov. Tate Reeves and other officials to request $47 million in state and federal funding to begin repairing the water system. Since then, the mayor and other city leaders have begun meeting with legislative leaders to discuss options.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Colorado's Wolf Creek Pass tunnel drainage project begins
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments