Black Construction Awarded $122 Million for Guam Wastewater Project
(UC) – Black Construction has been awarded a contract valued at approximately $122 million by the Guam Waterworks Authority to upgrade the Northern Wastewater Treatment Plant in the Village of Dededo.
The project scope of work includes the complete construction of new secondary wastewater treatment facilities at the Northern District Wastewater Treatment Plant, as well as upgrades and repurposing of certain existing infrastructure and facilities at the plant.
Work is expected to begin in the third quarter of 2019 with substantial completion anticipated in the fourth quarter of 2021, according to Black Construction's Los Angeles-based parent company, Tutor Perini Corporation.
Black Construction is based in Guam and includes affiliates E.E. Black Ltd. in the Philippines and Black Micronesia in Guam.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments