Pennsylvania Shuts Down Mariner East 1 Pipeline Because of Sinkhole
HARRISBURG, Pa. (AP) – State regulators are temporarily shutting down a major pipeline after sinkholes in the Philadelphia suburbs exposed the 8-inch-diameter pipe, threatening nearby homes and a rail line.
The Philadelphia Inquirer says the Public Utility Commission chairwoman ordered an immediate shutdown Wednesday to Sunoco Pipeline’s Mariner East 1 system, saying that its continued operation “could have catastrophic results.”
The pipeline carries as many as 70,000 barrels of natural gas liquids every day to a company terminal in Marcus Hook.
The sinkholes affecting the pipeline developed within 50 feet of homes and near an Amtrak rail line.
Sunoco will inspect the pipeline and test the ground. Shipments won’t be able to resume until investigators sign off. That’s expected to take 10 days or more.
The company’s spokesman says it’s working on a response.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Colorado's Wolf Creek Pass tunnel drainage project begins
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments