Ohio EPA Schedules Construction Storm Water General Permit Renewal Hearing
The Ohio EPA will hold a public hearing on March 28, 2018, to accept public comments about renewing the general permit for storm water discharges from construction sites in Ohio.
The public hearing will take place in Conference Room A at Ohio EPA’s Central Office, 50 West Town Street, Suite 700, Columbus.
The construction storm water general permit covers construction sites in Ohio that disturb one or more acres. The permit identifies how to obtain coverage, requires permittees to implement a storm water pollution prevention plan to minimize or eliminate the potential for contamination of storm water discharging to Ohio’s streams and lakes.
Currently, three construction general permits are available in Ohio, including separate permits with special conditions for projects in the Big Darby Creek and portions of the Olentangy River watersheds. The Ohio EPA is proposing to incorporate the Big Darby and Olentangy permits as separate sections of the statewide permit.
Other noteworthy changes proposed in the renewal include a requirement to submit applications and storm water pollution prevention plans electronically using Ohio EPA’s eBusiness Center and changes to post-construction requirements in order to improve capture of runoff and remove 80 percent of total suspended solids.
During the hearing, verbal or written comments on the proposed general permit may be submitted. Written comments will be accepted through April 4.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments