Pennsylvania Pipeline Work Resumes After $12M Fine, Changes
HARRISBURG, Pa. (AP) — Pennsylvania regulators are fining Sunoco more than $12 million for problems with a massive natural gas pipeline project, but letting work resume under a consent agreement.
The Department of Environmental Protection said Thursday that Sunoco Pipeline has made changes since work on the $2.5 billion Mariner East 2 pipeline was halted Jan. 3.
The 350-mile project has been plagued by spills and leaks of drilling fluid and improper construction methods.
In stopping the work, the state agency said Sunoco demonstrated it couldn’t or wouldn’t comply with Pennsylvania’s clean streams law and other regulations.
The company didn’t immediately respond to messages seeking comment.
The 20-inch pipeline will move natural gas liquid products from Marcellus Shale drilling fields in western Pennsylvania to a terminal in Philadelphia.
It’s scheduled for completion by summer.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments