Layne Christensen Announces Early Completion Of The Hermosa Pipeline Extension In The Delaware Basin
Layne Christensen Company today announced the early completion of the six-mile extension of its Hermosa water pipeline that was started in early December 2017.
”We are pleased that the extension was completed ahead of schedule and on budget and is now in operation,” J. Michael Anderson, Chief Financial Officer and President of Layne Water Midstream, said. “We have already sold water through the extended pipeline, which expands our water midstream business further north into Reeves County where access to water is more limited for oil and gas producers. We expect to see continuing demand growth for water in the energy sector, especially in the Delaware Basin, due to attractive producer economics, longer horizontal drilling lengths, and more use of water per foot of lateral length.”
Layne’s 26-mile Hermosa Pipeline system extends from company-owned land near Pecos, Texas northward in Reeves County and can deliver 175,000 barrels of water per day through 18 different delivery points along the route for use in energy drilling and completion operations.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments