Goodnight Midstream Commences Open Season on Llano Produced Water Pipeline System
Goodnight Midstream Permian, LLC today announced it has started a binding open season closing March 8, 2018 to provide an opportunity for producers to enter into long-term contractual commitments for the Llano Produced Water Pipeline System.
The Llano Pipeline will begin at its origin point in Lea County, New Mexico and transport produced water from the central Delaware Basin to Goodnight’s saltwater disposal well system on the Central Basin Platform (CBP) in the Eunice area. Once completed, it will contain an initial capacity of 200,000 barrels of water per day. As part of the project, Goodnight plans to construct multiple receipt points along the pipeline’s route with each receipt point having the capability to accept produced saltwater at 50 psi.
The project is anticipated to be placed in service in the fourth quarter of this year.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments