Roadway Reopening at Site of Massive Michigan Sinkhole
FRASER, Mich. (AP) — A roadway that was closed after a sewer line collapse caused a massive suburban Detroit sinkhole has reopened to traffic.
A ribbon-cutting took place for 15 Mile Road in Fraser at the site of the Christmas Eve collapse before it reopened Tuesday morning. Macomb County Public Works Commissioner Candice Miller credited engineers, construction crews and others for their contributions.
The county says it’s the last major step in the completion of the $75 million repair project.
Sewage earlier began flowing again through the major interceptor line and officials marked the milestone during a September ceremony.
The line 60 feet (18 meters) below ground serves roughly 500,000 Macomb County residents.
Families from roughly two dozen homes were displaced for about three weeks after the collapse and three houses were condemned.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- EarthGrid, EnerTech to deploy underground infrastructure projects across US in $18 billion investment
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
Comments