Federal Judge Dismisses Legal Effort to Halt Gas Pipeline
AKRON, Ohio (AP) — A federal judge has delivered a blow to some Ohio property owners’ efforts to stop construction of a high-pressure natural gas pipeline.
U.S. District Judge John Adams in Akron on Tuesday dismissed a lawsuit filed in May by more than 60 property owners. They want the Federal Energy Regulatory Commission prevented from approving construction plans for the 250-mile-long (402-kilometer) NEXUS pipeline.
The judge accepted a magistrate’s recommendation that the court in northern Ohio lacks jurisdiction to consider the challenge.
The $2 billion project is designed to carry 1.5 billion cubic feet (42.5 million cubic meters) of gas daily from the Utica and Marcellus shale fields in Appalachia across northern Ohio into Michigan and Ontario, Canada.
Attorney Aaron Ridenbaugh, an attorney representing the property owners, declined to comment Tuesday.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Colorado's Wolf Creek Pass tunnel drainage project begins
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments