Minnesota Regulators Cancel Pipeline Hearings
ST. PAUL, Minn. (AP) — The state Public Utilities Commission has canceled public hearings scheduled this week in St. Cloud on Enbridge Energy’s proposal to replace its aging Line 3 crude oil pipeline across northern Minnesota.
In a news release, the PUC says the city of St. Cloud advised the commission of “logistical and safety issues” related to many events being held Thursday at River’s Edge Convention Center.
The commission is reviewing options for rescheduling the two hearings in St. Cloud.
Last week, protesters cut short a hearing in Duluth on the Line 3 project.
Tribal and environmental groups say the project threatens pristine waters where wild rice grows.
Enbridge and its supporters say Line 3 is a needed piece of infrastructure, and that replacing it will make it safer while creating jobs.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments