Kinder Morgan Warns About Trans Mountain Delays
Kinder Morgan has warned that its Trans Mountain oil pipeline expansion project is facing possibly months of delays because of the timing of permit issuance and other regulatory approvals.
The delay could be as long as nine months, Kinder Morgan’s chief executive Steven Kean said in a recent conference call, adding, however, that the company was taking steps to mitigate the effects of the lengthy approval process. Kinder Morgan still believes there is a chance for the expanded Trans Mountain pipeline to start carrying crude from December 2019 as originally planned.
The Trans Mountain project, about as controversial as every new crude oil pipeline projects in Canada and the United States, needs more than a thousand permits before it can proceed. Kinder Morgan has already secured a few hundred of those, but it is now facing increased pressure from the new British Columbia government, which seems determined to stop the expansion whatever it takes.
A couple of months ago, after the New Democratic Party government was sworn in, Canadian media quoted the province’s environmental minister as saying that, “Our government made it clear that a seven-fold increase in heavy oil tankers in the Vancouver harbour is not in B.C.’s best interests,” although the industry begs to differ. There have been warnings that Canada’s oil sands production will soon outgrow its pipeline capacity, causing more oil to be transported by rail—a riskier way of transportation than pipelines.
The US$5.8-billion (C$7.4 billion) project is also threatened by a legal battle in which the NDP government has partnered with First Nations. This strong opposition to Trans Mountain, one of very few new oil pipeline projects approved by the Liberal federal government, is also putting British Columbia at odds with Canada’s main oil producing province, Alberta. Production is growing and the existing pipeline network is already operating at capacity, which makes the need for new pipelines quite pressing.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments