Kansas Gas Companies Told to Expedite Pipeline Replacement
TOPEKA, Kan. (AP) — The Kansas Corporation Commission has rejected a request from three gas companies, sticking to its original ruling that they need to speed up the replacement of obsolete pipeline deemed a safety risk.
The Topeka Capital-Journal reports that the commission ruled in September for Atmos Energy, Black Hills Energy and Kansas Gas Service to create a 10-year plan to replace unprotected and bare steel pipes. The companies also have to recoup funds at up to 40 cents per month per customer.
The ruling ended a years-long look at whether the companies needed to tackle their obsolete pipeline faster.
The companies filed a petition for reconsideration, but the commission rejected it last week, enforcing the three return with an accelerated replacement plan within three months and a final plan in six months.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments