FLINT, Mich. (AP) — Service lines have been replaced at more than 4,300 Flint homes during phase 4 of an effort to help fix the city’s lead-tainted water crisis.
FAST Start Replaces More Than 5,200 Water Lines in Flint
10/19/2017
The replaced lines are part of the city’s FAST Start initiative to put new water pipes in 6,000 homes this year.
More than 5,200 service lines have been replaced since FAST start began in March 2016. The program’s goal is to replace nearly 20,000 lead-tainted lines in Flint by 2020.
Flint was under state control when it switched from Detroit’s water system to the Flint River in 2014 to save money. The river water was not properly treated to prevent pipe corrosion.
Elevated levels of lead later were found in some children.
The city has since returned to Detroit’s system.
Related News
From Archive
Sign up to Receive Our Newsletter
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments