South Carolina AD Says Stadium Water Pressure Issue Resolved
COLUMBIA, S.C. (AP) — South Carolina athletic director Ray Tanner says water pressure problems that affected restrooms and concession stands at William-Brice Stadium have been resolved.
Tanner said Tuesday there was a flow issue connected to a valve on an underground line outside the stadium during last Saturday’s 23-13 loss to Kentucky.
Tanner also says there will be several areas set up around the stadium for this Saturday’s home game against Louisiana Tech. Fans will be able to purchase soda, peanuts and candy to alleviate waits at concession stands.
In addition, Tanner says he had received several complaints about high noise level from a new DJ added to game days. Tanner says modifications have been made to make the “sound level more enjoyable.”
Related News
From Archive
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- U.S. water reuse boom to fuel $47 billion in infrastructure spending through 2035
- $2.3 billion approved to construct 236-mile Texas-to-Gulf gas pipeline
- Major water pipe break in Puerto Rico hits over 165,000 customers
- Potomac River Tunnel project enters construction phase beneath Washington, D.C.
- Pennsylvania American Water launches interactive map to identify, replace lead water service lines
- Trump's tariffs drive $33 million cost increase for Cincinnati sewer project
- Utah city launches historic $70 million tunnel project using box jacking under active rail line
- Tulsa residents warned after sewer lines damaged by boring work
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized

Comments