South Carolina AD Says Stadium Water Pressure Issue Resolved
COLUMBIA, S.C. (AP) — South Carolina athletic director Ray Tanner says water pressure problems that affected restrooms and concession stands at William-Brice Stadium have been resolved.
Tanner said Tuesday there was a flow issue connected to a valve on an underground line outside the stadium during last Saturday’s 23-13 loss to Kentucky.
Tanner also says there will be several areas set up around the stadium for this Saturday’s home game against Louisiana Tech. Fans will be able to purchase soda, peanuts and candy to alleviate waits at concession stands.
In addition, Tanner says he had received several complaints about high noise level from a new DJ added to game days. Tanner says modifications have been made to make the “sound level more enjoyable.”
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments