Colorado Releases New Pipeline Regulation Outline
DENVER (AP) — Colorado regulators have released an outline for new rules governing oil and gas pipelines after a fatal house explosion blamed on a gas leak.
The outline calls for new standards for designing, testing and shutting down flow lines, which carry oil or gas from wells to tanks or other gathering equipment.
The documents, dated Sept. 8, were posted online Wednesday.
Regulators plan to complete draft rules by Oct. 15 and hold hearings in December. The Colorado Oil and Gas Conservation Commission, which regulates the industry, could vote on adopting the rules after that.
The rules are in response to an April explosion that killed two people.
Investigators blamed the explosion on gas leaking from a pipeline that was thought to be out of service but was still connected to a well.
Related News
From Archive
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- U.S. water reuse boom to fuel $47 billion in infrastructure spending through 2035
- $2.3 billion approved to construct 236-mile Texas-to-Gulf gas pipeline
- Major water pipe break in Puerto Rico hits over 165,000 customers
- Potomac River Tunnel project enters construction phase beneath Washington, D.C.
- Pennsylvania American Water launches interactive map to identify, replace lead water service lines
- Trump's tariffs drive $33 million cost increase for Cincinnati sewer project
- Utah city launches historic $70 million tunnel project using box jacking under active rail line
- Tulsa residents warned after sewer lines damaged by boring work
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized

Comments