Project to Fix Baltimore Sewer Backups Gets Underway
8/11/2017
BALTIMORE — Officials have kicked off a $430 million Baltimore-area sewer project intended to fix backups that lead to overflows.
The Baltimore Sun reported Thursday that the so-called “headworks project” at the Back River Wastewater Treatment Plant in Dundalk will add pumps to move backed-up sewage and water into holding tanks.
That will help during storms, when sewage and rainwater overwhelm the system and overflows end up in the Jones Falls and Inner Harbor.
The cost of the project is being split between the city and Baltimore County.
Mayor Catherine Pugh says it will fix “a very stubborn problem.”
The project is expected to be done by 2020.
Related News
From Archive
Sign up to Receive Our Newsletter
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments