Sunoco to Connect Homes With Tainted Wells to Public Water
WEST CHESTER, Pa. (AP) — Sunoco Pipeline LP is paying to connect municipal water to about 30 Pennsylvania residences whose well water was contaminated while the company built its Mariner East 2 Pipeline.
Sunoco says the residents in West Whiteland Township are being connected to Aqua Pennsylvania supply system. The township says a timetable and whether Sunoco will pay those residents’ monthly water bills is still being worked out. Aqua Pennsylvania says a 1,600-foot (487.7-meter)-long water main must be built to supply the homes.
Sunoco spokesman Jeff Shields says the company is still assessing the number of homes affected.
The $2.5 billion, 350-mile (563-kilometer) pipeline will carry propane, butane and ethane.
Township and other public officials say some wells stopped flowing and others produced cloudy water earlier this month after horizontal drilling in the area.
Related News
From Archive
- 27 pipeline safety violations tied to deadly Pa. chocolate factory explosion
- Contractor gas line strike triggers home explosion in Missouri
- LA recovery reports call for $650 million power line burial, major utility upgrades in Pacific Palisades
- FiberLight to build 1,400-mile West Texas dark fiber network in $350 million expansion
- Fatal trench collapse in Mass. leads to $4.6 million OSHA penalty, dozens of violations
- T-Mobile to expand fiber broadband infrastructure footprint with $4.9 billion Metronet acquisition
- NWPX grows water infrastructure portfolio with Colorado precast facility
- Cityside launches $100 million fiber build in Corona, Calif.
- FiberLight to build 1,400-mile West Texas dark fiber network in $350 million expansion
- Alaska fiber buildout to expand broadband in rural communities

Comments