Gas Pipeline Project Expected to Cause Traffic Delays in New Mexico
6/14/2017
SANTA FE, N.M. (AP) – A utility company will be realigning a six-mile stretch of natural gas pipeline along New Mexico State Road 68, causing traffic delays in the height of the Rio Grande tourist season.
The Santa Fe New Mexican reported (http://bit.ly/2s5GBmo ) Wednesday New Mexico Gas Co. plans to spend $14 million relocating pipeline from what has proven to be a geologically unstable route along the west side of the Rio Grande to a new alignment on the N.M. 68 right of way east of the river.
Gas company spokesman Tim Korte says motorists might experience delays of 15-30 minutes during the construction period.
Construction is scheduled to begin Aug. 1 and will run through November.
Related News
From Archive
Sign up to Receive Our Newsletter
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments