Contract Awarded for Lewis and Clark Water Pipeline Project
6/23/2017
TEA, S.D. (AP) — The organization responsible for a system that delivers water to towns and rural water systems in South Dakota, Iowa and Minnesota has awarded a contract to construct a pipeline.
The Lewis and Clark Regional Water System board of directors said Thursday that a roughly $2.2 million contract has been awarded to Winter Brothers Underground, of Sioux Falls, to construct the 3.8-mile MCWC-East service line along Six Mile Road in southeastern Sioux Falls.
After the pipeline and a meter building are completed, the infrastructure will provide a third and last connection for Minnehaha Community Water Corporation. Nearly $2.7 million had originally been budgeted for the work.
Related News
From Archive
Sign up to Receive Our Newsletter
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments