Peoria Pilot Project Keeping Water out of Sewer System
PEORIA, Ill. (AP) — A pilot project has kept over 600,000 gallons of rainwater out of Peoria’s sewer system.
The city’s two-block Adams Street project uses rain gardens, permeable pavers and other techniques to retain water. The (Peoria) Journal Star (http://bit.ly/2qzw83b ) reports it has diverted 638,000 gallons of water since Oct. 22.
A single rainstorm can send 32 million gallons of rainwater rushing into Peoria’s combined sewer system. That system feeds into the city treatment plant and then the Illinois River.
Rainwater overloads the system 25 to 30 times per year, sending sewage into the river.
The U.S. Environmental Protection Agency has pressed Peoria since the 1980s to solve the problem.
A civil engineer with the city says Peoria would need 250 similarly scaled projects to counter the 160 million gallons of yearly rainfall.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments