Michigan City to Remove Hundreds of Lead Water Pipes
KALAMAZOO, Mich. (AP) — More than 200 lead water pipes will be removed from a southwest Michigan city this summer.
MLive (http://bit.ly/2oU9UII ) reports the Kalamazoo City Commission approved a nearly $850,000 construction contract on Monday with Rieth-Riley Construction Co. to replace the lines. The city’s 2017 Water Capital Improvement Budget will fund the service line replacement project.
Public Services Director James Baker says Kalamazoo plans to replace almost 500 lead service lines during the 2017 construction season. Baker says on average the city has removed 100 lead pipes per year.
Many of the lead lines are located in the northeastern part of the city and in the city’s oldest neighborhoods.
The city collected lead and copper monitoring data a year early in response to public concern over the Flint water system lead problem.
Related News
From Archive
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments