Woolpert Chosen to Design Sewer Rehabilitation Project
4/10/2017
The Hampton Roads Sanitation District has selected Woolpert to provide study, design and administration services for a project to rehabilitate about one mile of sanitary sewer infrastructure in Newport News, Va.
The project includes 4,800 linear feet of gravity sewer pipeline and associated manholes along Jefferson Avenue from West Mercury Boulevard to 72nd Street.
The design of this project is now underway, with construction scheduled to begin in fall 2018.
Related News
From Archive
Sign up to Receive Our Newsletter
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments