South Dakota Town Receives $1.6 Million for Relining Project
4/13/2017
The South Dakota Board of Water and Natural Resources has approved a $1.606 million funding package for the City of Lake Norden to reline its wastewater collection system.
The funding package includes a $321,000 Consolidated Water Facilities Construction Program grant and a $1.285 million Clean Water State Revolving Fund loan.
The project involves relining 8,450 feet of sanitary sewer collection pipe and 188 manholes to rehabilitate areas within the city’s collection system that have been identified to have severe or moderate deficiencies. The city will also clean and televise an additional 8,900 feet of the system to determine if additional rehabilitation is necessary.
Related News
From Archive
Sign up to Receive Our Newsletter
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Colorado's Wolf Creek Pass tunnel drainage project begins
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments