DeKalb County Approves Sewer Contracts
4/12/2017
The DeKalb Board of Commissioners has approved a $7.2 million contract to Atlanta-based Compliance Envirosystems to remove trees and grease from sewer trunk lines.
Government officials hope the contract will allow the county to add sewer capacity without having to invest in new infrastructure.
“This presents an opportunity for upsizing these lines and reducing costs,” DeKalb County CEO Mike Thurmond said.
In other news, the commission also approved a $28.2 million contract for Atlanta-based Brown and Caldwell to rebuild a gravity sewer system. The project is designed to reduce sewer spills at 19 locations in Decatur and Avondale Estates.
Related News
From Archive
Sign up to Receive Our Newsletter
- Tunnel boring machine ‘Clack-A-Mole’ nears one-third completion in Oregon outfall project
- Texas A&M weighs underground transit plan with Elon Musk's Boring Co. to reduce campus traffic
- Lynchburg, Va., breaks ground on largest-ever Blackwater CSO tunnel project
- Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance
- Federal court halts permits for 32-mile Tennessee gas pipeline project
- Wisconsin proposes new PFAS drinking water standards to align with federal rules
- Elgin, Ill., joins EPA drinking water initiative to accelerate lead pipe replacement
- Dog River pipeline replacement in Oregon improves water supply with new HDPE pipe
- Leaking wastewater systems named top source of San Diego River contamination, study finds
- New Portable Welding System From Miller
Comments